An architectural drawing or architect’s drawing is a technical drawing of a building (or building project) that falls within the definition of architecture.

What are the types of construction drawings?

12 types of construction drawings

  • Site plan. A site plan provides a map of the construction site. …
  • Plot plans. Plot plans are like site plans in that they both depict the whole project site. …
  • Excavation plans. …
  • Floor plan. …
  • Elevation drawings. …
  • Section drawings. …
  • Detail drawings. …
  • Mechanical and electrical drawings.

What is construction drawing?

Construction drawing is the general term used for drawings that form part of the production information that is incorporated into tender documentation and then the contract documents for the construction works. … The main purpose of construction drawings is to provide a graphic representation of what is to be built.

What drawings are needed to build a house?

Types of Drawings for Building Design

  • Plans. Plans are diagrams drawn to scale, showing the arrangement of columns, beams, and ceilings inside a building. …
  • Interior and Exterior Elevations. …
  • Section Drawings. …
  • Interior & Exterior Detailing. …
  • Room Finishes and Schedules. …
  • Framing and Utility Plans.

What are MEP drawings?

The Purpose of MEP Drawings

MEP drawings are coordinating drawings that proactively solve spatial issues between mechanical, electrical, and plumbing components that will be installed in a building. … In addition, MEP drawings ensure that your systems don’t interfere with the structure of your building itself.

IT IS INTERESTING:  How do I draw a line at a specific angle in Sketchup?

What are shop drawings construction?

Shop drawings, or Technical drawings, are drawings or set of drawings that are produced by fabricators, contractors, subcontractors, manufacturers, or suppliers. They include plans, elevations, views, sections, and many other details and are typically required for prefabricated components.

What are the 3 types of construction?

The construction industry consists of three sectors: buildings, infrastructure and industrial. Residential and non- residential are the two main types of building construction.

How long do construction drawings take?

For small alterations, renovations or additions, the construction stage could take 3 to 6 months. A typical new residential project of a significant size will take from between 6 to 9 months for construction.

Do architects own their drawings?

Some building components may be patented, but the overall design cannot be. Thus, while architects and engineers may own their original models, drawings, and specifications, they do not own their designs. Copyrights belong to the author of the work, except works “for hire,” created as part of the author’s employment.