What is phasing in Revit?

Revit Architecture tracks the phase in which views or elements are created or demolished. It lets you create phases and phase filters that you can apply to views, which define how the project appears during various stages of work.

How do you show two phases in Revit?

Help

  1. Click Manage tab Phasing panel (Phases).
  2. Click the number box adjacent to the phase to combine with another phase.
  3. Under Combine with, click Next or Previous.
  4. Click OK.

How do you use phase filters in Revit?

Create phase filters (in addition to the default filters) to control the display of elements based on their phase status.

  1. Click Manage tab Phasing panel (Phases).
  2. In the Phasing dialog, click the Phase Filters tab.
  3. Click New to insert a new phase filter. …
  4. (Optional) Click in the Filter Name box to edit the name.

Where is the phase property set in Revit?

Phase Properties for Views

Each view in Revit has a Phase property and a Phase Filter property. The Phase property is the name of the view phase. When a view is opened or created, it automatically has a Phase value. You can copy a view and then select a different phase value for that view.

IT IS INTERESTING:  Can i render in sketchup?

How do I use temporary phase in Revit?

Go to Phases in the Manage tab. Go to Phase Filters tab and click New. Call it “Show Complete + Temp”.

How do Revit Worksets work?

When you make a workset editable in Revit, you are taking exclusive ownership of all objects in it. Only one user can exclusively edit each workset at a given time. All team members can view worksets owned by other team members, but they cannot always make changes to them.

Can you combine phases in Revit?

Click Manage tab Phasing panel (Phases). Click the number box adjacent to the phase to combine with another phase. Under Combine with, click Next or Previous. Click OK.

Can you delete a phase in Revit?

You cannot delete phases once they are created. They can only be combined with the previous or the next in the sequence.

How does View range work in Revit?

The view range is a set of horizontal planes that control the visibility and display of objects in a plan view. Every plan view has a property called view range, also known as a visible range. The horizontal planes that define the view range are Top, Cut Plane, and Bottom.

How do I create a halftone in Revit?

Define Halftone/Underlay Settings

  1. Click Manage tab Settings panel Additional Settings drop-down (Halftone/Underlay).
  2. In the Halftone/Underlay dialog, under Underlay, define the following settings: …
  3. Under Halftone, for Brightness, enter a value or use the slider to specify a setting between Light and Dark. …
  4. Click OK.

In the drawing area of the host model, select the linked Revit model. Click Modify | RVT Links tab Properties panel (Type Properties). In the Type Properties dialog, find the Phase Mapping parameter and click Edit. In the Phases dialog, select the appropriate mapping options for each phase, and click OK.

IT IS INTERESTING:  How do I turn on AutoSave in SketchUp?

How do you change phase graphics in Revit?

Apply a different graphic display or override to the elements in a phase status. Click Manage tab Phasing panel (Phases). In the Phasing dialog, click the Graphic Overrides tab. Click Lines to specify the weight, color, and line pattern for projection lines and cut lines.

When a view is opened or created by default the view phase is set to?

When a view is opened or created, it automatically has a Phase value. You can copy a view and then select a different phase value for that view. For example, the original view has Phase 1; the copy has Phase 2. You create an element in Phase 1 and demolish it in Phase 2.

Where are design options applied views?

Check the Design Option Settings for a View

  • Open a project view in which you want to see or edit a design option.
  • Click View tab Graphics panel (Visibility/Graphics).
  • In the Visibility/Graphics dialog, click the Design Options tab.